Every system is precision roll-formed from certified high-tensile structural steel, electrostatic powder-coated for corrosion resistance, and pre-configured for heavy commercial duty across England, Scotland, Wales, and Northern Ireland.
Engineered for seasonal inventory fluctuations in British 3PL facilities. Features reinforced bottom framing, nesting cups for vertical stability, and corrosion-proof powder coat.
Doubles or triples usable floor footprint without planning permission fees. Combines longspan picking levels below with open staging or pallet storage on upper decking.
Incorporates incline wheel tracks into longspan frameworks for automatic stock replenishment. Guarantees error-free first-in, first-out carton pick operations.
Eliminates individual forklift aisles for bulk SKU holding. Well-suited for UK cold storage facilities and beverage bottling sites operating on batch rotation.
Gravity-loaded telescoping push-back cart mechanism. Provides deep-lane pallet concentration while maintaining high SKU accessibility along single access aisles.
Automated pallet rover runs down deep storage tunnels via RF control. Cuts forklift transit time in half and protects upright posts from accidental mast impact.
Designed specifically for split-case piece picking, apparel assembly, and rapid parcel logistics. Equipped with ergonomic pick trays and heavy-gauge guide dividers.
Multi-level attic shelving structure utilizing longspan frame uprights as structural load columns. Supplied with galvanised open steel grid planking and kickplates.
Understanding cold-formed profile geometries, load deflection ratios under British Standard BS EN 15512, and deck selection for UK warehouse fire risk assessments.
In modern British supply chain logistics, Long Span Shelving Racks occupy the critical structural zone between light-duty archive shelving and heavy structural pallet racking. Operating primarily as heavy-duty, hand-loaded storage systems, they provide open bay clear spans ranging from 1,200 mm to 2,700 mm, with beam load tolerances engineered from 300 kg up to 1,200 kg Uniformly Distributed Load (UDL) per pair.
Our long span systems are manufactured from high-yield cold-rolled steel coils (Q235B / S235JR equivalent), conforming strictly to European Racking Federation (ERF) standards and the Storage Equipment Manufacturers' Association (SEMA) Code of Practice for the Design of Static Steel Racking. Every upright column features continuous omega-punch profiling at 50 mm vertical increments, enabling millimeter-level tier adjustments that eliminate vertical air wastage.
| Structural Parameter | Standard Longspan (Medium) | Heavy-Duty Longspan | Mezzanine-Supported Longspan |
|---|---|---|---|
| Typical Bay Widths (Clear Span) | 1200mm, 1500mm, 1800mm | 1800mm, 2000mm, 2400mm, 2700mm | 1500mm, 1800mm, 2200mm |
| Frame Depths (Standard) | 400mm, 500mm, 600mm | 600mm, 800mm, 900mm, 1000mm, 1200mm | 600mm, 800mm, 1000mm |
| UDL Capacity per Level | 300 kg – 500 kg | 600 kg – 1,200 kg | 400 kg – 800 kg + Floor Loads |
| Upright Column Profile | 55mm × 47mm × 1.5mm Omega | 60mm × 50mm × 1.8mm / 2.0mm | 80mm × 60mm × 2.0mm Heavy Section |
| Beam Section Geometry | Step Beam / Z-Profile 50×30mm | Heavy Step Beam 60×40mm / 80×40mm | Reinforced Box Beam with Cleat Welds |
| Decking Surface Types | 18mm High-Density Chipboard / Steel | Drop-in Steel Panels / Wire Mesh | Galvanised Steel Grating / Flow Plates |
| UK Regulatory Standard | BS EN 15512:2020 | SEMA Code / HSG76 | UK Building Regs Part K & B |
How premier British logistics corridors, omnichannel distribution networks, and industrial manufacturing plants deploy our long span shelving architectures.
Situated within the Northamptonshire, Leicestershire, and Warwickshire golden distribution corridor where next-day parcel delivery SLAs dictate workflow. Our long span shelving powers fast-turn pick towers, reverse logistics processing tables, and parcel staging areas.
Serving automotive component wholesalers and aerospace MRO suppliers in Birmingham, Coventry, and Derby. Heavy components like brake discs, transmissions, exhausts, and body pressings require rugged shelf decks that will not sag or crack under point loads.
For MHRA-regulated pharmaceutical storage and secure records facilities around Greater Manchester and the M25 belt. Clean electrostatic powder finishes prevent dust entrapment, while wire mesh decks allow free air circulation and overhead fire sprinkler water penetration.
As prime industrial rents across Heathrow, East London, and the North West break historical records, UK operators are transforming racking specifications.
With prime logistics rents in South East England exceeding £18 to £25 per square foot, ground footprint extension is cost-prohibitive. Facilities are pivoting to 4-tier rack-supported mezzanine floors to exploit warehouse clear heights of 10m to 14m.
Autonomous Mobile Robots (AMRs) now share picking aisles with operators. Longspan racks are engineered with unobstructed floor-level clearances and high-contrast navigational barcode markers for machine vision guidance.
The UK Health and Safety Executive (HSE) enforces rigorous periodic inspections. Buyers increasingly avoid generic unbranded imports in favor of verified load-rated frames, factory inspection logs, and stamped load safety notices.
UK developers pursuing BREEAM "Outstanding" credentials require low-embodied-carbon steel, solvent-free heavy-metal-free electrostatic powder coatings, and completely reusable modular shelving systems with zero landfill impact.
Guangzhou Heda Shelves Co., Ltd. (founded 2001) brings 25 years of technical excellence, advanced automated roll-forming equipment, and end-to-end quality assurance directly to British importers, racking contractors, and logistics operators.
Full CE Certification (No. 2435-CPR-8605159), ISO 9001:2015 Quality Management (No. 18624Q00169R0M), and RoHS compliant surface coatings. Full metallurgical mill certificates and structural test reports provided for UK council building control approvals.
Our dedicated engineering department generates tailored CAD warehouse layouts, 3D photorealistic renderings, and seismic/deflection calculations within 24 to 48 hours. Compare floor density, aisle clearances, and pallet locations before financial commitment.
Spanning 30,000 m² of modern industrial workshop space staffed by 300+ trained technicians. High-precision automated punching lines and robotic welding ensure that beams, uprights, and brackets fit smoothly on-site without binding or excessive play.
Certified steel coil spectrographic analysis
High-speed slitting with tight length tolerances
Continuous CNC hole punch for 50mm pitch
Multi-station precision roll profile forming
Laser micrometric dimensional verification
Mechanical deburring and shot polish clean
Shielded arc automated connector welding
Acid pickling bath removes oils and rust
Electrostatic thermoset cure at 200°C
Export bundle packing & container loading plan
Key facts on UK import compliance, shipping routes, SEMA inspections, fire regulations, and structural guarantees.
Send your warehouse floor plans, ceiling clearance heights, and pallet/box load specifications. Our engineering team will return a compliant 2D CAD layout, 3D visualization, and detailed pricing proposal within 24 hours.
Instant access to comprehensive technical dimension sheets, load beam capacity tables, and configuration options.
Get Catalog