[email protected] Serving Southeast Asia, South Asia & the Middle East
EN

Warehouse High Density Gravity Roller Pallet Flow Rack

Product Description

Pallet Flow Racking System Preview 1
Pallet Flow Racking System Preview 2
Specification
Item Heavy Duty Pallet Flow Racking
Style FIFO Racking System
Material Grade Q235/Q345
Certification ISO9001
Standard Color Blue(RAL5017), Orange(RAL2004), Green(RAL6000), Light Grey (RAL7035), Yellow(RAL1037)
Access Style High Accessibility & Selectivity
Adjustable Pitch 50mm, 50.8mm, 75mm, 76.2mm
Finishing Powder Coated Or Galvanized
Application Environment Normal Temperature Or Freezer
Back-up Service Installation Drawing / On Site Instruction
Design Service Free CAD Service Available
Lead Time 3 Weeks for 2*40' Container
Standard Package Palletized, Export-Purpose Packaging
Container Load 10-15 tons / 1*20' container, 20-25 tons / 1*40' container
Trade Term EXW / FOB / CNF / CIF
Pallet Flow Rack Structure
Pallet Flow Rack Engineering Drawing
Gravity Roller Detail
Pallet Racking Component Showcase
Pallet Loading Configuration
Company Profile
Company Factory Facility
Manufacturing Equipment
Production Workshop
Customer Photos
Customer Installations and Site Visits
Our Advantages
Factory Advantages and R&D Capabilities
Packing & Delivery
Packaging Process Detail 1
Packaging Process Detail 2
Pallet Bundling and Wrapping
Container Loading Operation
Frequently Asked Questions
Q: How does a FIFO Heavy Duty Pallet Flow Racking system work?

A: Pallet Flow Racking operates on a First-In, First-Out (FIFO) principle. Pallets are loaded from the higher end of slightly inclined roller tracks and glide safely down by gravity toward the picking face at a controlled speed.

Q: Can this racking system be implemented in cold storage or freezer conditions?

A: Yes. Our systems are engineered using high-grade Q235/Q345 steel with durable powder-coated or galvanized surface finishes suitable for ambient temperature warehouses as well as freezer environments.

Q: Do you offer customized layout designs and CAD drawing support?

A: Yes, we provide free professional CAD layout and engineering design services tailored specifically to your facility's architectural dimensions, pallet sizes, and load requirements.

Q: What is the typical lead time for manufacturing and delivery?

A: The standard production lead time is approximately 3 weeks for two 40-foot containers. Delivery schedules can be coordinated according to chosen trade terms (EXW, FOB, CNF, or CIF).

Q: What installation support is provided after delivery?

A: Every project includes detailed step-by-step structural installation drawings. On-site technical guidance or engineer instruction is also available depending on project requirements.

Related Products