| Product Name | Double Deep Pallet Racking |
| Style | Quick access, adjustable |
| Material | Grade Q235 (or SS400) Q345 |
| Certification | ISO9001 |
| Standard Color | Blue (RAL5017), Orange (RAL2004), Green (RAL6000), Light Grey (RAL7035), Yellow (RAL1037) |
| Adjustable Pitch | 50mm, 50.8mm, 76.2mm |
| Access Style | High accessibility & selectivity |
| Surface Treatment | Powder Coated or Galvanized |
| Application Environment | Normal Temperature or Freezer |
| Design Service | Free CAD service available |
| Back-up Service | Installation Drawing / On Site Instruction |
| Lead Time | 3 weeks for 2*40' container |
| Standard Package | Palletized, Export-Purpose Packaging |
| Container Load | 15-18 tons / 1*20' container, 20-25 tons / 1*40' container |
| Trade Term | EXW / FOB / CNF / CIF |
Double Deep Pallet Racking stores pallets two rows deep instead of single rows, eliminating unnecessary aisles and increasing warehouse storage density by up to 30% compared to standard selective racking.
A specialized reach truck or deep-reach forklift equipped with extendable pantograph forks or telescopic fork attachments is needed to easily reach the second pallet position.
Yes, our double deep racking supports both normal ambient temperatures and cold or freezing warehouse environments with durable galvanized or specialized powder-coated finishes.
Yes, we provide complimentary 2D and 3D CAD design services tailored to your warehouse dimensions, pallet sizes, and forklift specifications to maximize your operational efficiency.
The typical lead time is approximately 3 weeks for two 40-foot containers. Each 20-foot container holds 15-18 tons, while a 40-foot container holds 20-25 tons of palletized export-secured racking components.
We supply detailed, step-by-step installation drawings and structural guidance. On-site engineer instruction and remote technical support are also available upon request.