| A full varity of ranges and accessories available | |
|---|---|
| 1. Item | Electric Movable Shelving Rack System |
| 2. Style | Quick access, Adjustable |
| 3. Material | Grade Q235 (or SS400) Q345 |
| 4. Certification | CE/ISO9001 |
| 5. Standard Color | Blue(RAL5017), Orange(RAL2004), Green(RAL6000), Light Grey (RAL7035), Yellow(RAL1037) |
| 6. Adjustable Pitch | 50mm, 50.80mm, 75mm, 76.20mm |
| 7. Access Style | High accessibility & selectivity |
| 8. Finishing | Powder Coated or Galvanized |
| 9. Application Environment | Normal Temperature or Freezer |
| 10. Design Service | CAD service available |
| 11. Back-up Service | Installation Drawing/On Site Instruction |
| 12. MOQ | 1 unit |
| 13. Lead time | 3 weeks for 2*40' container |
| 14. Standard package | Palletized, Export-Purpose Packaging |
| 15. Container Load | 10-15tons/1*20' container, 20-25tons/1*40' container |
| 16. Trade Term | EXW/FOB/CNF/CIF |
The MOQ is 1 unit, catering to both custom pilot projects and large-scale industrial warehouse installations.
Yes. The system is engineered for dual application environments, performing reliably in both normal temperature warehouses and freezer cold-storage units.
We use premium Grade Q235 (SS400 equivalent) or Q345 steel. The surface finishing options include durable electrostatic powder coating or galvanization for corrosion resistance.
Yes, full CAD design services are available prior to production, complemented by comprehensive installation drawings and on-site technical instructions.
Production lead time is typically 3 weeks for two 40-foot containers. Loading capacities range from 10-15 tons per 20' container to 20-25 tons per 40' container.
The system complies with strict international standards and is fully certified under CE and ISO9001 guidelines.